|
The North South Corridor is a Hong Kong MTR railway line that is part of the Sha Tin to Central Link project. It is on the ready-to-build stage. It will extend the East Rail Line to Admiralty station through the fourth cross-harbour railway tunnel in Hong Kong.〔http://www.legco.gov.hk/yr06-07/chinese/panels/tp/tp_rdp/papers/tp_rdp0716cb1-2058-1-c.pdf〕 Before the rail merger, services on the operational sections of the line were provided by KCRC. Completion of the line is scheduled in 2020. It will also reduce train lengths to 9 cars from 12 cars when opened, due to platform restrictions in Hong Kong Island.〔http://www.mtr-shatincentrallink.hk/en/faq/〕 ==Stations== ;Note 1 The section from Admiralty to Hung Hom will open at 2020; the section from Hung Hom northward is still part of the East Rail Line. 2 Kwu Tung, Chau Tau and Lok Ma Chau are stations on the Lok Ma Chau Spur Line, a branch from Sheung Shui Station of the . 3 Trains stop at Racecourse on race days only. Trains stopping at Racecourse do not stop at Fo Tan. 4 Proposed station 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「North South Corridor」の詳細全文を読む スポンサード リンク
|